How to Prepare for an Electrical Installation – 5 Things to Do Before Your Electrician Arrives
Electrical installations can be disruptive — walls might need drilling, furniture moved, and power turned off for hours at a time. But with the right preparation, you can make the process smooth, safe, and stress-free for everyone involved. Whether you’re adding new sockets, upgrading your consumer unit, or wiring a kitchen renovation, a little planning ahead of time will save you money, avoid misunderstandings, and keep the job on schedule.
At Bluerock Electrical, we’ve worked in hundreds of homes across Barnet and North London, and we can always tell when a client has taken the time to prepare. It makes a huge difference — we spend less time moving furniture and more time doing what you’ve hired us to do: deliver a neat, professional electrical job that meets the highest safety standards.
Why Preparation Matters Before Electrical Work
Electrical installations aren’t just about connecting wires — they’re about making sure your home remains safe, clean, and functional during and after the job. When preparation is skipped, electricians may have to stop work to clear space, clarify outlet locations, or re-plan cable routes. This can lead to:
-
Delays – Work takes longer when rooms aren’t ready or decisions haven’t been made.
-
Extra costs – Last-minute changes might require additional labour or materials.
-
Mess and disruption – Without prep, dust and debris can spread through the house.
-
Safety risks – A cluttered workspace can be dangerous for both you and the electrician.
By following these steps, you can save time, reduce stress, and get a cleaner, faster installation.
1. Clear and Prepare the Work Area
Start by making sure your electrician has easy access to every area they’ll be working in. This means:
-
Moving furniture away from walls where new sockets or switches will be installed.
-
Taking down pictures, shelves, or decorations that might be in the way.
-
Clearing hallways and entryways so tools and equipment can be brought in safely.
-
Covering floors with dust sheets if you want extra protection.
If you can’t move heavy furniture yourself, let your electrician know in advance so they can plan for extra time or manpower. A clear space not only makes work faster but also reduces the risk of accidents and damage.
2. Confirm Outlet, Switch, and Lighting Locations
Before installation day, take a walkthrough of the space with your electrician or mark locations yourself. Ask yourself:
-
Where do I usually plug in appliances, chargers, or lamps?
-
Are there enough sockets for today’s needs (and tomorrow’s)?
-
Where should light switches be for the best convenience?
-
Do I want any outdoor sockets or lighting points added?
Marking these locations with painter’s tape is a simple but powerful way to avoid confusion. When decisions are made on the spot, you risk ending up with sockets in inconvenient places — or worse, having to redo work later.
3. Agree on Finishes, Materials, and Fittings
Another common cause of delays is uncertainty about finishes. There are lots of options available for sockets, switches, and lights — from standard white plastic to brushed steel, matt black, or decorative plates.
Discuss with your electrician:
-
The style and finish of outlets and switches.
-
Whether you want dimmer switches, USB sockets, or smart controls.
-
The type of lighting you want — warm white, cool white, LED strips, or spotlights.
-
Any energy-saving preferences, like motion sensors or timers.
Having all of this agreed beforehand means your electrician can order the right parts and bring everything needed on the day, avoiding wasted trips to suppliers.
4. Plan for Temporary Power Outages
Electrical work often requires the power to be turned off for a few hours — sometimes the whole day, depending on the job. You can prepare for this by:
-
Charging laptops, phones, and power banks the night before.
-
Keeping a torch or portable light handy if the job runs into the evening.
-
Unplugging sensitive electronics like TVs and computers.
-
Letting family members or housemates know in advance so there are no surprises.
If you work from home, talk to your electrician about scheduling the job at a time when you can manage without power — or request that they keep critical circuits running where possible.
5. Coordinate with Other Trades and Household Activities
If you’re doing more than just electrical work, make sure your tradespeople are working in the right order. For example:
-
Electrical work should be done before plastering, painting, or tiling — not after.
-
If you’re having a kitchen installed, have your electrician in before the cabinets go up.
-
If flooring is being replaced, plan for cables or conduit to be run first.
Also think about how the work will affect your daily routine. If the kitchen will be out of action, plan meals ahead of time. If kids or pets will be home, arrange to keep them safely out of the work area.
Preparing properly is one of the easiest ways to ensure your electrical installation goes smoothly, stays within budget, and leaves you with a finish you’re proud of.